24 Project work day
What to do!
Check out the added Hot Tip on the Project Overview:
Reaching a 90% or above on your final report requires, at minimum, that you meet the expectations and directions outlined here (in addition to some basics). You’re encouraged to check your progress toward these goals with this handy checklist before submitting your report. This is not an exhaustive list (such a list is impossible to write out), but covers the key components.Work on Project Milestone 5, due by 11:59pm today. Make sure to read and follow the directions, and check your work before submitting it.
If you finish that, keep going! The next step is to turn in the final report, due Tuesday.
I’ll meet with each group before floating around and addressing coding questions. If you have questions about code, remember to first chat with your group members. If you are still stuck as a group, ask me!
24.1 Wrap-up
Upcoming due dates (all linked on the course schedule and posted on Moodle):
Today (11:59pm): Project Milestone 5.
Tuesday 12/10 (5pm): Final project report and documentation
Saturday 12/14 (12pm): Final project reflection form due
Saturday 12/14 (1:30-3:30pm): Final presentations
Though you’re welcome to attend the full 2 hours, each group will be assigned to present (and be present) during a 1-hour block:- 1:30-2:30pm
- Fast food 1!
- (American) football!
- Natural disasters!
- Fast food 2!
- 2:30-3:30pm
- Pet adoption!
- Baseball!
- Polar bears!
- 1:30-2:30pm